You are here: Planning the Model > Building a Model > Phase 3: Additional Operations > Process and Routing Logic
The process and routing table below shows all of the changes and additions to the Phase 2 model in bold text.
Entity |
Location |
Operation (min) |
Blk |
Output |
Destination |
Rule |
Move Logic |
---|---|---|---|---|---|---|---|
Pallet |
Receive |
|
1 |
Blank |
NC_301L |
FIRST 6 |
MOVE WITH CellOp |
Blank |
NC_302L |
FIRST |
MOVE WITH CellOp |
||||
Blank |
NC_301L |
WAIT N(3,.2) FREE CellOp WAIT 5.7 |
1 |
Cog |
Degrease |
FIRST 1 |
MOVE WITH CellOp |
Blank |
NC_302L |
WAIT N(3,.2) FREE CellOp WAIT 5.7 |
1 |
Cog |
Degrease |
FIRST 1 |
MOVE WITH CellOp THEN FREE |
Cog |
Degrease |
ACCUM 2 WAIT 5 |
1 |
Cog |
Inspect |
FIRST 1 |
MOVE WITH CellOp THEN FREE |
Cog |
Inspect |
WAIT U(3.2,.3) Test = Dist1() IF Test = 1 THEN BEGIN JOIN 1 Bearing WAIT U(1.2,.2) FREE CellOp ROUTE 1 END ELSE BEGIN FREE CellOp ROUTE 2 END |
1 |
Cog |
EXIT |
FIRST 1 |
|
2 |
Reject |
EXIT |
FIRST 1 |
|
|||
Bearing |
Bearing_Que |
|
1 |
Bearing |
Inspect |
JOIN 1 |
MOVE FOR .05 |
This concludes the final phase of our model building session. We now turn our focus to running the model.